HGIYS
Stations · East of England

WickfordWIC

1 operator · Greater Anglia
100
Reliabilitybeats 86%
Cancellationsbeats 96%
Frequencybeats 85%
Connectivitybeats 91%
Overall7 of 2,435
Arrive within 3 min
92.2%
National average 84.3%
Stops cancelled
1%
National average 3.1%
Trains per day
159
57,790 scheduled stops
Data coverage
99%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
75%80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 90.5%Sept 2025 · 81.8%Sept 2025 · 81.8%Oct 2025 · 89.8%Nov 2025 · 94.8%Dec 2025 · 92.8%Jan 2026 · 95.8%Feb 2026 · 95.8%Mar 2026 · 95.5%Apr 2026 · 94.6%May 2026 · 95.7%Jun 2026 · 93.6%Jul 2026 · 95.3%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202590.5%
Sept 202581.8%
Sept 202581.8%
Oct 202589.8%
Nov 202594.8%
Dec 202592.8%
Jan 202695.8%
Feb 202695.8%
Mar 202695.5%
Apr 202694.6%
May 202695.7%
Jun 202693.6%
Jul 202695.3%

Details

RegionEast of England
Station facility ownerGreater Anglia
Operators calling
Greater Anglia
Annual entries and exits1,838,264
Annual interchanges406,901
Scheduled stops57,790
Measured stops57,232