Stations · East of England
WivenhoeWIV
1 operator · Greater Anglia
99
Reliabilitybeats 93%
Cancellationsbeats 99%
Frequencybeats 59%
Connectivitybeats 80%
Overall35 of 2,435
Arrive within 3 min
94.7%
National average 84.3%
Stops cancelled
0.6%
National average 3.1%
Trains per day
71
25,975 scheduled stops
Data coverage
99.4%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 94.6% |
| Sept 2025 | 92.1% |
| Sept 2025 | 91% |
| Oct 2025 | 96.6% |
| Nov 2025 | 94.8% |
| Dec 2025 | 94.3% |
| Jan 2026 | 96.2% |
| Feb 2026 | 96.5% |
| Mar 2026 | 95.4% |
| Apr 2026 | 95.4% |
| May 2026 | 95.6% |
| Jun 2026 | 93.2% |
| Jul 2026 | 94.8% |
Details
| Region | East of England |
| Station facility owner | Greater Anglia |
| Operators calling | Greater Anglia |
| Annual entries and exits | 352,166 |
| Annual interchanges | 471 |
| Scheduled stops | 25,975 |
| Measured stops | 25,817 |