HGIYS
Stations · North West

Wallasey Grove RoadWLG

1 operator · Merseyrail
96
Reliabilitybeats 100%
Cancellationsbeats 88%
Frequencybeats 73%
Connectivitybeats 35%
Overall96 of 2,435
Arrive within 3 min
99.2%
National average 84.3%
Stops cancelled
1.4%
National average 3.1%
Trains per day
113
41,055 scheduled stops
Data coverage
49.3%
Share of stops actually measured
Treat this score with caution. Only 49.3% of stops at Wallasey Grove Road are measured by the ORR, so its punctuality rests on a thin sample. The score is pulled toward the national average to compensate.

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Sept 25Mar 26Apr 26Sept 2025 · 99%Jan 2026 · 99.1%Feb 2026 · 99.1%Mar 2026 · 99.3%Apr 2026 · 99.4%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Sept 202599%
Jan 202699.1%
Feb 202699.1%
Mar 202699.3%
Apr 202699.4%

Details

RegionNorth West
Station facility ownerMerseyrail
Operators calling
Merseyrail
Annual entries and exits498,762
Annual interchanges0
Scheduled stops41,055
Measured stops20,237