Stations · South East
Windsor and Eton CentralWNC
1 operator · Great Western Railway
99
Reliabilitybeats 100%
Cancellationsbeats 74%
Frequencybeats 71%
Connectivitybeats 85%
Overall36 of 2,435
Arrive within 3 min
99.1%
National average 84.3%
Stops cancelled
1.8%
National average 3.1%
Trains per day
106
38,460 scheduled stops
Data coverage
98.2%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 99.3% |
| Sept 2025 | 99.3% |
| Sept 2025 | 99.2% |
| Oct 2025 | 99.3% |
| Nov 2025 | 99.6% |
| Dec 2025 | 99.1% |
| Jan 2026 | 99.3% |
| Feb 2026 | 99.3% |
| Mar 2026 | 98.9% |
| Apr 2026 | 98.8% |
| May 2026 | 98.4% |
| Jun 2026 | 99.1% |
| Jul 2026 | 98.1% |
Details
| Region | South East |
| Station facility owner | Great Western Railway |
| Operators calling | Great Western Railway |
| Annual entries and exits | 1,708,274 |
| Annual interchanges | 26,094 |
| Scheduled stops | 38,460 |
| Measured stops | 37,755 |