Stations · London
Wanstead ParkWNP
1 operator · London Overground
96
Reliabilitybeats 95%
Cancellationsbeats 52%
Frequencybeats 80%
Connectivitybeats 85%
Overall90 of 2,435
Arrive within 3 min
94.8%
National average 84.3%
Stops cancelled
2.6%
National average 3.1%
Trains per day
137
49,670 scheduled stops
Data coverage
97.3%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 95.3% |
| Sept 2025 | 95.2% |
| Sept 2025 | 95.3% |
| Oct 2025 | 93.7% |
| Nov 2025 | 92.4% |
| Dec 2025 | 94.7% |
| Jan 2026 | 95.1% |
| Feb 2026 | 95.6% |
| Mar 2026 | 96.2% |
| Apr 2026 | 96.5% |
| May 2026 | 93.7% |
| Jun 2026 | 93.4% |
| Jul 2026 | 94.3% |
Details
| Region | London |
| Station facility owner | London Overground |
| Operators calling | London Overground |
| Annual entries and exits | 1,071,144 |
| Annual interchanges | 26,795 |
| Scheduled stops | 49,670 |
| Measured stops | 48,351 |