Stations · London
West NorwoodWNW
1 operator · Great Northern, Thameslink, Southern and Gatwick Express (GTR)
98
Reliabilitybeats 98%
Cancellationsbeats 53%
Frequencybeats 87%
Connectivitybeats 86%
Overall58 of 2,435
Arrive within 3 min
95.8%
National average 84.3%
Stops cancelled
2.5%
National average 3.1%
Trains per day
180
65,391 scheduled stops
Data coverage
97.3%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 97.4% |
| Sept 2025 | 96.4% |
| Sept 2025 | 95.6% |
| Oct 2025 | 95.7% |
| Nov 2025 | 96.2% |
| Dec 2025 | 96.1% |
| Jan 2026 | 95.3% |
| Feb 2026 | 96.4% |
| Mar 2026 | 95.4% |
| Apr 2026 | 96% |
| May 2026 | 95.5% |
| Jun 2026 | 94.8% |
| Jul 2026 | 95.1% |
Details
| Region | London |
| Station facility owner | Govia Thameslink Railway (Southern) |
| Operators calling | Great Northern, Thameslink, Southern and Gatwick Express (GTR) |
| Annual entries and exits | 1,507,342 |
| Annual interchanges | 34,525 |
| Scheduled stops | 65,391 |
| Measured stops | 63,633 |