HGIYS
Stations · London

West NorwoodWNW

1 operator · Great Northern, Thameslink, Southern and Gatwick Express (GTR)
98
Reliabilitybeats 98%
Cancellationsbeats 53%
Frequencybeats 87%
Connectivitybeats 86%
Overall58 of 2,435
Arrive within 3 min
95.8%
National average 84.3%
Stops cancelled
2.5%
National average 3.1%
Trains per day
180
65,391 scheduled stops
Data coverage
97.3%
Share of stops actually measured

Punctuality over time

Aug 2025 to Jul 2026
% of trains arriving within 3 minutes of schedule.
80%85%90%95%100%Aug 25Oct 25Jan 26Apr 26Jul 26Aug 2025 · 97.4%Sept 2025 · 96.4%Sept 2025 · 95.6%Oct 2025 · 95.7%Nov 2025 · 96.2%Dec 2025 · 96.1%Jan 2026 · 95.3%Feb 2026 · 96.4%Mar 2026 · 95.4%Apr 2026 · 96%May 2026 · 95.5%Jun 2026 · 94.8%Jul 2026 · 95.1%
This station National average (84.3%)
Punctuality by railway period
PeriodArrived within 3 minutes
Aug 202597.4%
Sept 202596.4%
Sept 202595.6%
Oct 202595.7%
Nov 202596.2%
Dec 202596.1%
Jan 202695.3%
Feb 202696.4%
Mar 202695.4%
Apr 202696%
May 202695.5%
Jun 202694.8%
Jul 202695.1%

Details

RegionLondon
Station facility ownerGovia Thameslink Railway (Southern)
Operators calling
Great Northern, Thameslink, Southern and Gatwick Express (GTR)
Annual entries and exits1,507,342
Annual interchanges34,525
Scheduled stops65,391
Measured stops63,633