Stations · London
FarringdonZFD
2 operators · Elizabeth line, Great Northern, Thameslink, Southern and Gatwick Express (GTR)
83
Reliabilitybeats 69%
Cancellationsbeats 18%
Frequencybeats 100%
Connectivitybeats 98%
Overall421 of 2,435
Arrive within 3 min
87.8%
National average 84.3%
Stops cancelled
4.2%
National average 3.1%
Trains per day
1,101
400,877 scheduled stops
Data coverage
95.8%
Share of stops actually measured
Punctuality over time
Aug 2025 to Jul 2026% of trains arriving within 3 minutes of schedule.
This station National average (84.3%)
| Period | Arrived within 3 minutes |
|---|---|
| Aug 2025 | 90% |
| Sept 2025 | 87.1% |
| Sept 2025 | 86.2% |
| Oct 2025 | 85.8% |
| Nov 2025 | 84.6% |
| Dec 2025 | 89.5% |
| Jan 2026 | 87.2% |
| Feb 2026 | 89.7% |
| Mar 2026 | 90% |
| Apr 2026 | 90.2% |
| May 2026 | 89.7% |
| Jun 2026 | 85.7% |
| Jul 2026 | 85.4% |
Details
| Region | London |
| Station facility owner | London Underground |
| Operators calling | Elizabeth lineGreat Northern, Thameslink, Southern and Gatwick Express (GTR) |
| Annual entries and exits | 50,171,290 |
| Annual interchanges | 9,341,764 |
| Scheduled stops | 400,877 |
| Measured stops | 383,943 |